Steel Structure
Q235/Q355 Grade Steel
H-Shaped Steel
C/Z Section Steel
Insulation Panel (EPS/PU/Rock Wool), Metal Sheet
Crane, Drainage Pipe, Door, Window
Over 25 Years
30 Days After Receiving the Deposit
T/T, L/C, PayPal
In modern industrial and commercial operations, efficient land and space utilization is key to reducing costs and increasing efficiency. Canglong’s double-layer factory building is the ultimate solution tailored for you, perfectly realizing the core value of multiplying space by utilizing a single site.



The Canglong double-layer steel factory building is engineered around a rigid portal frame system, optimized for industrial loads and vertical space utilization.
| Component | Material / Specification | Standard / Note |
|---|---|---|
| Main Frame | Q355B Welded H-beam & Column | GB/T 1591 / ASTM A572 Gr.50 |
| Secondary Frame | Q235B Galvanized C/Z Purlin | GB/T 700 / ASTM A36 |
| Surface Treatment | Hot-dip Galvanized ≥80μm or Painted | ISO 1461 |
| Wall & Roof Panel | PU / Rock Wool / EPS Sandwich Panel | 50mm–200mm, customizable |
| Design Life | 50 years | GB 50017 |
| Wind Resistance | Up to 180 km/h (customizable) | Local building code |
| Seismic Resistance | Zone 8–9 (customizable) | GB 50011 |
| 2nd Floor Live Load | 300–500 kg/m² standard | Up to 1,000+ kg/m² optional |
| Crane Capacity | Up to 20 tons (1st floor) | Custom runway beam design |
| Fabrication Time | 4–6 weeks | FOB / CIF delivery |
| On-site Assembly | 2–4 weeks (typical) | Numbered components + drawings |

Maximize Space Utilization
Through innovative vertical space design, the effective usable area is easily doubled within the same footprint. The first floor can be used for heavy production, equipment installation, or raw material storage, while the second floor can be used for light assembly, offices, product showrooms, or logistics sorting centers. This vertical division of functions facilitates a smoother production process.
Sturdy, Safe, and Reliable Structure
The main frame is constructed of high-strength H-shaped steel (such as Q355), which offers excellent mechanical properties and strong load-bearing capacity, ensuring overall stability and superior earthquake and wind resistance. Galvanized C-shaped steel purlins form a lightweight yet strong secondary structure system, ensuring long-term safety.
Fast, cost-effective construction
All steel components are prefabricated in the factory, ensuring high precision and controlled quality. Only standardized assembly is required on-site, making construction significantly faster than traditional concrete construction. This significantly shortens your return on investment, allowing you to commence operations faster and seize market opportunities.
Excellent enclosure system performance
Rock wool sandwich panels, PU sandwich panels, or EPS sandwich panels can be selected for wall and roof panels, tailored to your needs. These materials offer excellent thermal insulation, fire resistance, sound insulation, and moisture resistance, creating a more comfortable working environment for employees while providing stable storage conditions for precision equipment and specialized goods.
Flexible customization, adaptable to the future
The double-story steel structure factory building offers tremendous design flexibility. Span, column spacing, and floor height can all be customized. The spacious interior allows for flexible partitioning and renovation to accommodate future business changes, offering strong scalability and adaptability.


In-House Engineering — No Outsourced Drawings
Every double-layer factory building is modeled in Tekla Structures 3D by Canglong’s own structural engineering team (15+ licensed engineers). This eliminates fit errors during assembly and allows real-time design adjustments based on your local building codes.
Factory Pre-Assembly Before Shipping
At our 1,332,000㎡ ISO-certified production base in Henan, China. You receive numbered components that bolt together on-site — no field cutting or welding required for standard connections.
Full-Package EPC Support
Canglong doesn’t just sell steel kits. We deliver structural calculations, foundation drawings, container loading plans, and remote installation guidance as standard. For complex projects, we can dispatch an on-site engineer to supervise assembly.
Global Project Portfolio
We have completed double-layer and multi-storey steel structures in Zambia, Ghana, Chile, Thailand, the Philippines, and Romania. Each project is documented with photos, dimensions, and client-verified performance data. Browse our project gallery →

Manufacturing and Processing: Small and medium-sized machinery manufacturing, automotive parts, and home appliance assembly. The first floor handles heavy machining and raw material intake; the second floor supports sub-assembly and quality control stations.
Warehousing and Logistics: E-commerce distribution centers, high-bay warehouses, cold chain storage, etc. First floor for receiving, sorting, and dispatch; second floor for slow-moving inventory or climate-controlled storage.
Comprehensive Use: Front-of-house and back-of-house facilities, integrating R&D and production, and display and warehousing. Ideal for showrooms on the ground level with production or stock management upstairs — common in automotive 4S centers and industrial parks.
| Phase | Duration | Deliverable |
|---|---|---|
| Design & Detailing | 1–2 weeks | 3D model, fabrication drawings, foundation plan |
| Steel Fabrication | 4–6 weeks | Numbered components, packing list, loading plan |
| Shipping | 2–5 weeks | FOB/CIF to destination port |
| On-site Assembly | 2–4 weeks | Guided by installation manual + video support |
Expedited production available for urgent projects. Contact our sales team for a project-specific schedule.
Need a custom design for your site? Request a free structural design and quotation →
The second-floor live load is typically designed for 300–500 kg/m², suitable for light assembly, offices, or inventory storage. For heavier equipment, Canglong engineers can reinforce the frame to support 1,000+ kg/m².
Steel component fabrication takes 4–6 weeks. On-site assembly is typically 2–4 weeks — significantly faster than concrete construction. Canglong provides numbered components and detailed installation drawings to streamline assembly.
Yes. The first-floor frame can be designed to accommodate overhead cranes up to 20 tons. Crane runway beams, column reinforcement, and foundation loads are all engineered during the design phase.
Canglong offers PU (polyurethane), rock wool, and EPS sandwich panels (50mm–200mm). PU provides the best thermal insulation (U-value ≈ 0.22 W/m²K); rock wool offers A-grade fire resistance.
Yes. Using high-strength Q355 steel and rigid frame connections, our double-layer factory buildings can be designed for seismic zones 8–9 per GB 50011 or equivalent local codes.
Canglong delivers factory-direct pricing with no middleman markup. Every double-layer building is engineered to your exact span, height, and load requirements, so you only pay for what you need. Request a tailored quotation and receive a detailed breakdown within 24 hours.
Your email address will not be published. Required fields are marked *
Canglong projects cover more than 120 countries and regions around the world, providing one-stop steel structure building solutions from design to installation.