Furniture manufacturing is a floor-hungry business. Panel saws, CNC routers, spray booths and stacked timber all want clear space, and rental industrial estates in Sydney do not hand out 160-metre floors. The client behind this project solved it by building: a steel factory in Western Sydney with a main workshop 162.4 m long and 39.45 m wide under a 9.8 m eave, and a second production block beside it that brings the project to roughly 14,000 m² of floor. Canglong Group’s package covered the steel structure, the bolted connections and the stairs — a deliberately narrow scope, and worth explaining, because it shaped the whole build.
| Country | Australia |
|---|---|
| Location | Western Sydney, New South Wales |
| Function | Furniture production factory |
| Main workshop | 162.4 × 39.45 m, eave height 9.8 m (6,407 m²) |
| Total floor area | ≈ 14,000 m² with the second production block |
| Roof structure | Steel trusses in every bay, sized for the 39.45 m span |
| Supply scope | Steel structure, bolted connections, stairs |
| Envelope | Concrete tilt-panel walls and roof sheeting, installed locally |
At a 39.45 m clear width, a roof stops being a routine job. A rolled-section rafter that has to reach that far becomes very deep and very heavy, and the steel tonnage climbs faster than the span does. A truss solves the problem differently: it turns the rafter into a lattice, so the material sits in the chords where it works hardest and the web members carry the rest. For the same span you get a lighter, stiffer roof — and in this project the client and the design took that logic to every bay, not just the widest one.
The erection photos show why the choice pays for itself on site. Each truss landed complete, lifted by crane into position between the columns, and the bays closed in one after another down the 162 m length. There are no spliced mid-air connections to engineer on the fly and no reason for the roof line to change character along the building — the interior the factory ended up with is one long, unbroken, column-free span, which is exactly what a production line layout wants.

Most of the factory buildings we deliver are complete kits — frames, purlins, cladding, doors, flashings, the whole envelope. This client chose a narrower scope: primary steel structure, the bolted connections that join it, and the staircases. The building skin — precast concrete tilt panels for the walls and the roof sheeting — was procured and installed by the local build team around our frame.
It is a sensible split when the conditions are right. Wall and roof trades were already organised locally, and a heavy factory frame is exactly the part that rewards factory control: connections drilled and matched to their drawings before anything ships, so the steel bolts together at the pace of the cranes rather than the pace of site modifications. The photographs catch the two scopes meeting in the middle — tilt panels standing, trusses overhead, roof sheeting working its way across the bays — with neither trade waiting on the other. For clients who want the whole building from one supplier, that is our usual industrial factory building brief; for clients with their own construction management, structure-only is a clean boundary to work to.

The specification reads like it was written from the factory floor backwards. A 39.45 m clear width fits production lines down the middle with material handling on both sides; a 9.8 m eave leaves room for tall equipment, ducted extraction and stacked timber storage under the trusses; and 162 m of length lets cutting, machining, assembly and finishing sit in sequence instead of fighting for the same bay. The stairs in our package connect the levels the plant actually uses. None of this is exotic — it is the ordinary geometry of furniture production, and the structure simply has to deliver it without a single column in the way.
The completed building wears a plain industrial face — light walls, a low roof line, a stair tower marking the entrance — which is what a working factory in Western Sydney should look like. The client got roughly 14,000 m² of purpose-built production floor, a roof engineered for its span rather than around it, and a steel package that arrived matched to its bolts. That last part is easy to overlook, but it is the habit that keeps a build of this size on schedule.

Above roughly 30 metres of clear span, a solid rafter becomes deep and heavy and steel tonnage rises quickly. A truss carries the same span with less material because the lattice puts steel where it works hardest, and complete trusses lift into place as single units, keeping the erection sequence simple. On this project every bay was trussed to keep the roof consistent along the full 162 m length.
On this project: the primary steel frames and roof trusses, the bolted connections machined to match their drawings, and the staircases. Walls, roof sheeting and finishes were handled by the client’s local construction team, which suited a build where envelope trades were already organised on site.
The main workshop measures 162.4 × 39.45 m with a 9.8 m eave height, about 6,407 m² on its own. Together with the second production block, the project reaches roughly 14,000 m² of steel-framed production floor.
Yes. Most export projects take the complete kit: frames, purlins, sandwich panel or sheet cladding, doors, flashings and fasteners packed for the erection sequence. Steel-only scopes like this Sydney furniture factory are offered when the client has local trades and prefers to manage the envelope themselves.
Australia
Furniture Factory
2022-7-5
Western Sydney, New South Wales
6405㎡
The structural system supplied for this project:
– Long-span steel roof trusses in every bay, carrying the 39.45 m clear width
– High-specification H-section columns for overall stability
– Complete bolted connections and staircases; walls and roof sheeting by the client’s local team



Your email address will not be published. Required fields are marked *