This 540 m² agricultural warehouse stands in a village setting in the Czech Republic, built to keep farm machinery dry and workable through Central European winters. The main hall measures 36 × 15 m with a 7 m eave height — dimensions set by the machines it holds, not by a standard layout. The photo shows the frame near completion: dark-painted H-section portal frames, galvanized purlins going on, and nothing left to do but close the envelope.

| Item | Detail |
|---|---|
| Building type | Agricultural warehouse — machinery and equipment storage |
| Location | Czech Republic |
| Main hall | 36 × 15 m, eave height 7 m |
| Floor area | 540 m² |
| Roof | Double slope |
| Main frame | Welded H-section columns and rafters, painted |
| Secondary frame | Galvanized C-section purlins and girts |
| Envelope | EPS sandwich panels, roof and walls |
| Foundation | Isolated reinforced pad footings (by client) |
| Scope | Design, fabrication, supply, shipping, installation guidance |
A warehouse for farm equipment is a different building from a cargo warehouse, and the differences start at the eave. A combine harvester with its header mounted stands over 4 m tall; add tipping trailers, telehandler boom clearance, and roof space for future equipment, and 7 m at the eave is a working minimum, not a luxury. The 15 m clear span keeps the floor free of interior columns across the full width, so machines can be parked in rows and driven straight through rather than shuffled around posts.
The 36 m length divides naturally: machinery bays along one wall, bulk and workshop space along the other. The client sets the internal split — doors, partitions and window openings are all positioned before fabrication, because changing an opening in a steel panel wall later means cutting panels that arrived pre-finished.
The primary frame is welded H-section steel, shot-blasted and painted before shipping; the photo shows the dark finish that holds up against the damp Central European climate. Roof and wall purlins are galvanized C-sections — the galvanizing does the corrosion work where the steel is thinnest.
The envelope is EPS sandwich panel over the roof and walls. For an unheated machinery shed the insulation does one specific job: it moderates the temperature swing between a cold night and a sunny afternoon, which is what causes condensation to form on steel machine bodies and tools stored inside. Drier air, less rust, and machines that start on cold mornings without a film of moisture on the electrics. Panels arrive pre-finished and screw to the purlins — no separate lining and cladding trades on site.
The foundation work was conventional for this frame type: isolated reinforced pad footings at each column, cast by the client’s local crew to the anchor-bolt layout we supplied. The steel arrived as a numbered bolt-together kit — columns, rafters, purlins, bracing and panels — and was raised bay by bay with a mobile crane. Village sites have their own constraints: narrow access, neighbours close by, soft ground after autumn rain. A bolted kit keeps the site work short, quiet and free of hot works, which is exactly what a setting like this one asks for.
Our scope ran from design and fabrication through shipping to on-site installation guidance: a supervisor working with the local crew through frame raising and panel installation, so the critical stages are done right the first time.
For farms that need a standard storage barn rather than a sized-to-order hall, our steel barn warehouse range covers the common agricultural layouts — machinery storage, feed and crop storage, and combined uses — using the same frame technology as this project.
Nearby in Central Europe, we completed a customized agricultural warehouse in Germany for a modern farming operation. Further afield, a farm warehouse in Chile shows the same building class adapted to South American site conditions.
Planning a machinery shed, barn or farm warehouse? Send us the machines you need to house, the site location, and any size limits — we will propose a frame layout with a quotation.
What eave height does farm machinery storage need?
Plan around your tallest machine plus working clearance. Combines with headers fitted stand over 4 m; telehandlers need boom headroom; tipping trailers raise the requirement further. That is why this project sits at 7 m — comfortable for current machines and for the next generation of equipment, which is always taller than the last.
Why insulate a warehouse nobody heats?
Insulation in an unheated shed is about condensation, not warmth. An uninsulated steel roof cools fast at night and heats fast in sun; the temperature swings drive moisture onto machine surfaces and tools. An insulated envelope damps those swings, keeping stored equipment drier through the year — the main reason to specify sandwich panels on machinery storage.
How long does a 540 m² building take to erect?
With the foundation ready and the kit on site, a crew raising frames bay by bay typically closes the envelope on a building of this size in a few weeks, depending on weather and crew size. The kit arrives cut, drilled and numbered with an assembly manual, and installation guidance is available for the critical stages — no field welding is required.
Czech
Agricultural Warehouse
2024-10-31
Central Bohemian Region, Czech
540㎡

No

No