The core building of a modern power plant, built by Canglong Group for an Indonesian client, has officially commenced operations. This project utilizes a full-process EPC (engineering-procurement-construction) service model, integrating Chinese intelligent manufacturing technologies with localized Southeast Asian construction standards to create a benchmark project that meets international energy facility regulations.
Compared to traditional power plant construction, this project shortened the construction period by six months and the investment payback period by 2.3 years, making it a model for cost reduction and efficiency improvement in Southeast Asian EPC projects.
Indonesia
Power Plant
2020-10-26
Sumatra Island
3400㎡
1. High-Performance Enclosure System
Polyurethane Sandwich Panel Walls (PU Sandwich Panels, 100mm Thick):
Airtight Joint Treatment: Dual-pass sealing with EPDM rubber sealing strips and structural adhesive ensures a positive pressure environment within the plant (meeting cleanliness requirements for power generation equipment).
2. Heavy-Duty Steel Structure System
Seismic Design:
3. Power Generation Facility Adaptive Design
Equipment Foundation Pre-embedded:
Optimized Operation and Maintenance Access: