Angola Beverage Factory

Angola Beverage Factory
Angola Beverage Factory

A beverage factory asks more of a building than a warehouse does. The lines need clear floor space, the roof height has to absorb tanks, ducting and ventilation without bumping into the rafters, and the walls have to survive daily washdowns in a tropical climate. This project — a 60 × 45 × 7 m beverage production factory in Angola, completed in 2018 — answers all three with a fairly simple kit: a double-slope steel frame that ends in parapet walls, a hybrid wall of brick masonry and 750 mm horizontal sandwich panels, and a 50 mm EPS roof.

steel frame of a beverage factory rising above its brick base walls in Angola

Project at a Glance

Item Detail
Building type Beverage production factory — steel frame production hall
Location Angola
Dimensions 60 × 45 × 7 m (approx. 2,700 m² footprint)
Roof form Double slope with parapet walls
Roof panels 50 mm EPS sandwich panels
Walls Brick masonry base with 750 mm horizontal sandwich panels above
Interior use Beverage production line
Year completed 2018
Scope Steel frame fabrication, roof and wall panels, packing and shipping

Why a Steel Frame Suits a Beverage Plant

A filling or bottling line is really a long strip of equipment, and what it needs from the building is uninterrupted floor. The 45 m clear span here means the production line, its service corridor and the fork traffic all live inside one open hall — no interior columns to route around, and room to re-run the layout when the product mix changes. Around that clear core, the 60 m side gives enough length to separate raw material intake, mixing, filling and palletizing into their own bays without walls in the way.

The 7 m eave height does quieter work. Process ducting, cable trays, ventilation and the headroom above tanks all stack up faster than people expect, and a hall sized only for the machines ends up cramping exactly those services. Seven meters leaves that overhead zone free. It is the same logic we apply across our standard factory building projects: size the shell for the services, not just the equipment.

interior of the 45 m clear span steel frame during erection, beverage factory Angola

A Double-Slope Roof That Ends in a Parapet

The roof is a straightforward gable — two planes falling from the ridge to both 60 m eaves — which is the honest choice for a wet season that delivers short, heavy downpours. Water leaves the building quickly from two edges instead of pooling along one long run.

The parapet is the detail that changes how the building reads from the outside. By extending the walls above the roofline, the roof edge, outlets and any rooftop services disappear behind a clean vertical face, and the hall presents a flat, continuous facade on all four sides. For a factory that customers, distributors and inspectors may visit, that finished silhouette costs little during fabrication — the frame simply continues up — and removes the visual clutter a bare gable edge creates.

Brick Below, Panels Above

The walls combine two materials, each doing the job it is best at. The lower zone is brick masonry: it shrugs off forklift knocks, hose water and the splash zone where ground moisture and rain bounce back up — the parts of a beverage plant wall that take the most abuse. Above the brick, 750 mm sandwich panels run horizontally between columns. Horizontal joints shed rain naturally instead of exposing long vertical seams to it, and the panel widths keep the facade lines even.

beverage factory shell clad with horizontal sandwich panels over brick base walls in Angola

Overhead, the roof is closed with 50 mm EPS sandwich panels. In a climate where the sun alone can push an uninsulated roof sheet past the point where the hall below becomes unusable by mid-afternoon, even a modest insulation layer flattens the temperature curve noticeably. Where a client’s process needs tighter temperature control than that — fermentation, cold syrup storage, sensitive ingredients — we uprate the roof and wall panels rather than pretending one thickness fits every building. Here, the production floor is ambient, so 50 mm was the right-sized answer.

Packed at the Workshop, Opened on Site

Everything in the building — frames, purlins, panels, fasteners — was fabricated, bundled and loaded into shipping containers at our works before heading to Angola. Steel members are nested to waste as little container space as possible, panels travel crated at the container ends where they cannot be crushed, and every bundle is tagged to its position in the building so the site crew opens containers in erection order instead of hunting for parts.

steel members and sandwich panels loaded into shipping containers for the beverage factory in Angola

On arrival, the same tagging pays off again: bundles go from container to position on the slab without intermediate re-sorting, which matters when your site storage is a fenced patch of laterite rather than a warehouse.

containers opened on site with panel packs and steel bundles for the Angola beverage factory

Erection Order on a Laterite Site

The ground across much of Angola is that deep orange laterite soil you can see in every photo of this site, and it shapes the build sequence. The brick base walls went up first on conventional foundations, set by local masons — masonry is a local trade everywhere, and it is simpler to build a two-meter wall in place than to ship one. The steel frame then bolted down on top: columns to the brick base and embedded anchors, rafters and bracing following bay by bay.

60 m long steel frame of the beverage factory during erection on the laterite site in Angola

With the frame standing, the telehandler you see inside the span lifted purlins and panel packs into position, the roof closed in from one gable to the other, and the horizontal wall panels followed between the columns above the brick line. The sequence keeps each trade working on dry ground ahead of the other, which is half the battle on a red-dirt site through a rainy season.

The Building Today

The hall has been running beverage production since 2018. For us the project is a useful reference point on two questions buyers ask often: yes, a steel frame and brick walls combine cleanly when each material is given the right zone, and yes, a parapet-topped double-slope roof is a practical upgrade for factories that need to look finished as well as work hard. Similar projects in our West Africa record include the 55 × 30 m paper factory with crane in Cameroon and the 7,852 m² multi-span industrial plant in Cameroon.

Frequently Asked Questions

Can a steel structure be combined with brick walls?

Yes, and it is a common specification for food and beverage plants. The brick handles the abuse zone — washdown water, impacts, ground splash — while the steel frame carries the roof and keeps the interior clear of load-bearing walls. The two meet at an anchor detail along the base, which is designed into the frame from the start.

Is 50 mm EPS panel enough for a factory roof in a hot climate?

For an ambient production floor, a 50 mm EPS roof panel makes a real difference against an uninsulated sheet and is the most cost-effective way to get it. If the process inside needs stable or cool temperatures, the honest answer is to move to a thicker panel or a different core — that is a conversation about the product, not the climate alone.

What eave height does a beverage production hall need?

Seven meters, as here, covers most bottling and filling lines with ducting, trays and tank headroom to spare. Lines with tall fermentation tanks, mezzanines or overhead conveyor crossings push toward 9 m. Size the height for the services above the equipment, not the equipment alone.

How is a steel factory building shipped to Angola?

Fully disassembled and containerized: steel members nested in bundles, panels crated, all components tagged to their erection position. Everything loads into standard shipping containers at our works and travels door-to-plant, so the site receives a kit that opens in build order.

Project Info

Country

Angola

Angola
Project Name

Beverage Factory

Project Date

2018-7-13

Product Address

Industrial Zone, LUCALA City, Kuanza Norte Province

Area

2448㎡

Customer Reviews
10.612 Rating
Quality 4.8
Price 4
Design 88
Service 91
Delivery 83
Package 75
Project Details

In response to the special needs of Angola’s tropical climate and beverage production, the Canglong Group project team conducted a three-month in-depth research in the early stage. On the one hand, in combination with the local high temperature and high humidity environment, the focus is on optimizing the temperature and humidity control, anti-corrosion design, and cold chain logistics support of the workshop. On the other hand, conduct research on the preferences of Angolan consumers and mainstream beverage types (such as juice, carbonated drinks, and plant-based protein drinks), and plan production line compatibility and expansion space accordingly.

In the design phase, flexible production concepts are integrated, and through modular layout, the filling line is designed as a structure that can quickly switch between different specifications of bottle types. At the same time, it is equipped with automated bottle sorting machines, UHT ultra-high temperature sterilization equipment, and intelligent quality inspection systems, which not only meet the large-scale production needs of current mainstream products, but also reserve technical interfaces for future expansion of high-end beverage lines.

steel structure packaged and shipped

steel structure arrived

steel structure installation

beverage factory construction

Angola Beverage Factory

Angola Beverage Factory

Angola Beverage Factory