Construction Site Steel House

Construction Site Steel House

Construction Site Steel House

The construction site steel house designed specifically for the needs of construction sites, engineering camps, and temporary facilities, combined with a high-strength steel structure frame and high-performance enclosure system, provides project teams with a fast, safe, durable, and reusable solution for office, residential, and storage space.

Construction Site Steel House

Construction Site Steel House

steel structure modular house

steel structure modular house

Construction Site Steel House

The main body is sturdy, safe and reliable

The load-bearing frame is made of high-strength galvanized H-shaped steel or square steel pipes, which are earthquake resistant, wind resistant, and have strong stability, meeting the harsh environmental requirements of construction sites.

The overall structure is designed with modular design, bolted connections, easy installation and disassembly, and can be reused multiple times, significantly reducing long-term costs.

Flexible and optional enclosure system to meet diverse needs

EPS sandwich panel: lightweight and economical, thermal insulation, suitable for cost sensitive scenarios such as ordinary offices and dormitories.

Rock wool sandwich panel: A-level fireproof, soundproof and weather resistant, suitable for kitchens, power distribution rooms, temporary storage points for dangerous goods, etc. with high fire protection requirements.

One stop package, ready to use upon delivery

Canglong Group provides comprehensive supporting services such as standard doors and windows, drainage systems, and reserved electrical wiring holes, reducing the hassle of multi-party procurement coordination for customers and ensuring complete functional delivery.

Doors and windows are designed specifically for construction site environments, with good sealing and high safety. Anti theft measures can be installed as needed.

Rapid deployment, saving time

All components are prefabricated in the factory, and there is no need for wet work on site. Assembly is efficient, and a standard construction site office can be set up within a few hours, greatly reducing project preparation time.

Green and environmentally friendly, sustainable utilization

The main structure can be disassembled and reorganized, relocated without damage, reducing construction waste, in line with the concept of green construction, and reducing the comprehensive cost of temporary facilities.

Whether it’s the project manager’s office, worker dormitories, tool warehouses, or mobile kitchens, Canglong Construction Site Steel House can provide you with safe, comfortable, and economical temporary building options. We support customized sizes and layouts to assist in the efficient launch of global construction projects!

    Why Choose Us?

  • The first and largest steel structure & sandwich panels factory in north of China.
  • 20 years experience direct factory with competitive price, stable and controllable quality.
  • Over 100 million dollars of annual output.
  • More than 100000m2 production industrial park.
  • One stop service from design to installation.
  • 10 units free 3D designs & 10 units design structural drawings per day.
  • Professional installation teams in 30+ countries.
  • CE,ISO certificates.
  • Supply quality guarantee for 15 years.
  • Cooperating with 100+ countries & 2000+ partners.

Get A Free Quote

Your email address will not be published. Required fields are marked *

Page Bottom Form

Get A Free Quote

Pop Form