The factory project built by Canglong Group for a Malian client has successfully completed the construction and installation of the roof steel structure system. The project adopts a comprehensive building scheme combining brick concrete structure and steel structure: the lower wall is constructed using brick walls to ensure overall stability and economy. The roof support system uses high-strength H-shaped steel beams, which have excellent load-bearing performance and strong span adaptability, providing an open and unobstructed internal space for the factory building.
The roof is covered with metal roof panels, which are lightweight, durable, and easy to construct, effectively resisting local climate conditions such as high temperatures and strong winds. This hybrid structural system fully utilizes the advantages of materials, while ensuring functionality and safety, it also reflects Canglong Group’s ability to provide specialized technical solutions in the field of overseas industrial construction.
Mali
Factory Building
2023-11-19
Région de Bamako
1466㎡




Your email address will not be published. Required fields are marked *
Figure out what you want, choose the type of building you need, understand the cost, contact Canglong then go get it!