Canglong Group has successfully built a large industrial plant for Cameroonian client, providing a one-stop solution for the entire process from design to construction. The project has a construction area of 7852 square meters and adopts advanced double slope multi span steel structure design, achieving maximum space utilization through scientific layout.
At present, the project has been completed with high quality and delivered for use. The completion of this modern factory marks another important achievement for Canglong Group in the African market. The group has once again demonstrated its comprehensive competitiveness in the international industrial construction field with its professional steel structure technology strength and rich international project experience, and has received high praise from customers.


Cameroon
Industrial Plant
2023-5-17
Kribi City, Southern Province
7852㎡
The main structure of the industrial plant adopts high-quality Q235 H-beam beam column system, ensuring the structural stability, safety and reliability of the large plant. The wall system adopts PU sandwich panels with excellent insulation performance, which have excellent thermal insulation and fire resistance, and can effectively adapt to the local climate conditions in Cameroon, providing comfortable guarantee for the production environment.
No
No








Your email address will not be published. Required fields are marked *
Figure out what you want, choose the type of building you need, understand the cost, contact Canglong then go get it!